Two decades of safety, quality, and delivery — recognized by the operators who set the industry's standards.

From safety milestones to vendor performance, every recognition here reflects the same standard we hold on site: work delivered right, on schedule, every time.

Our Awards

PT Perusahaan Gas Negara Tbk

PT Perusahaan Gas Negara Tbk

Award Plaque

CSM Awards PMO 2019 — Safe Working Hours Achievement.

PT Perusahaan Gas Negara Tbk

PT Perusahaan Gas Negara Tbk

Certificate of Achievement

Safe working hours achievement of 50,000 hours in the Cepu/Oyekan WMO area.

PT PLN (Persero) UID Jakarta Raya

PT PLN (Persero) UID Jakarta Raya

Award Plaque

Best Vendor Performance for 3 Consecutive Years 2022.

PT Pertamina Hulu Rokan

PT Pertamina Hulu Rokan

Award Plaque

Highest achievement since transfer of operations on August 9, 2021 — 70 POP wells in July 2025 with a cumulative 1,725 POP.

PT PGAS Solution

PT PGAS Solution

Certificate of Achievement

Best Contractor in High-Risk EPC Work Category 2018.

PT Perta Drilling Contractor

PT Perta Drilling Contractor

Certificate of Achievement

SIFO 200 Days — CS WUR EW GP Mitigation 2 PDCM North Area Banko - Alam.

PT Perusahaan Gas Negara Tbk

PT Perusahaan Gas Negara Tbk

Award Plaque

CSM Awards PMO 2018 — Safe Man Hours Bronze Awards.

PT Pertamina Gas

PT Pertamina Gas

Award Plaque

HSSE Achievement Award — 5,402,696 safe working hours with zero lost injury.

Track Records

[01]

9 Power Plant

Delivered 9 power plant projects spanning coal-fired, gas, diesel, hydro, and geothermal power facilities.

[02]

8 Metering Station & Facility

Completed 8 metering station & facility projects covering gas metering, crude oil metering, and fuel terminal installations.

[03]

550 km Power Transmission

Installed 550 km of power transmission lines including 410 km underground MV, 40 km upper ground MV, 40 km upper ground HV, and 60 km HDD MV distribution.

[04]

130 km Pipeline Construction

Built 130 km of pipelines covering distribution, gas transmission, and HDD pipeline construction across multiple project sites.

[05]

220 Well Facility

Executed 220 well facility projects including rig substructure installation, wellhead installation, and 300 km of wellpad road construction.

[06]

Mining & Hauling

Moved more than 3,000,000 m³ of fresh soil and hauled over 600,000 m³ of gravel across mining sites.