Our Products

Huawei

One-fits-all and standardized off-grid and grid-connected power solution, accelerating low-carbon transformation for mining and industrial operations.

  • A group of interconnected loads and distributed energy resources within clearly defined electrical boundaries
  • Acts as a single controllable entity with respect to the grid
  • Operates in either grid-connected or in island mode

  • Connects to a 35 kV or lower power grid, located near users, and mainly used for local consumption
  • Involves a wide variety of energy sources.

  • Functions as a load that stores the electric energy generated by a distributed power system
  • Functions as a distributed power system that discharges electric energy to loads

Huawei

One-fits-all and standardized off-grid and grid-connected power solution, accelerating low-carbon transformation for mining and industrial operations.

  • Reliable, Agile, and Sustainable, the Optimal Choice for Power Supply in the Intelligent Computing Era

  • Modular Redundancy Design, Hot-swappable Components, Reducing Single Point of Failure

  • Ultra-high-grade Container Structure Design and Material Selection, 25 Years Worry-free for Outdoor Deployment

Huawei

One-fits-all and standardized off-grid and grid-connected power solution, accelerating low-carbon transformation for mining and industrial operations.

  • A group of interconnected loads and distributed energy resources within clearly defined electrical boundaries
  • Acts as a single controllable entity with respect to the grid
  • Operates in either grid-connected or in island mode

  • Connects to a 35 kV or lower power grid, located near users, and mainly used for local consumption
  • Involves a wide variety of energy sources.

  • Functions as a load that stores the electric energy generated by a distributed power system
  • Functions as a distributed power system that discharges electric energy to loads

Huawei

One-fits-all and standardized off-grid and grid-connected power solution, accelerating low-carbon transformation for mining and industrial operations.

  • Level 4 AFCI, ahead in the industry OV voltage shutdown 4 layer protections

  • Maintenance Free 2 Strings per MPPT, More Energy No Fuse & Other Quick-wear Parts, Yields Built-in PID Recovery, Secure Better Module Performance

  • No Fuse & Other Quick-wear Parts, Inverter Touch Free Online Smart I-V Curve Diagnosis, Module Touch Free

Selerys

One-fits-all and standardized off-grid and grid-connected power solution, accelerating low-carbon transformation for mining and industrial operations.

  • Radar detects cumulus clouds with storm potential moving toward the mine site. Two-stage alerts are issued at 30 km and 15 km — delivered via software dashboard and WhatsApp.

  • When the cloud's motion cone approaches, the balloon is deployed via a single software command. The GPS-guided balloon with hygroscopic flare is drawn into the cloud's updraft core, releasing the flare precisely to disperse cloud particles before rainfall.

  • Automatic rainfall stations compare rain-hours and rainfall volume inside vs. outside the mine site. Data is captured in real time through the integrated software platform to validate diversion effectiveness.

Mahatrax

Mahatrax integrates ADAS, driver monitoring, cameras, and fuel & load sensors on every haul truck — streaming through a secured network to the cloud application server and your monitoring dashboard.

  • Know where every unit is and how it's running — without radio check-ins. Monitor the whole fleet on a single live site map, set geofences per work zone, and get automatic alerts the moment a unit leaves its route or enters a restricted area.

  • Raise trip counts and cut wasted time. The system automatically detects every hauling cycle and measures cycle time, trips, and payload — so the sources of lost time and cost are easy to find.

  • PA·UA·MA·EU calculated automatically — not from manual timesheets. Working / Standby / Repair time is read straight from device signals, with loss analysis showing where availability slips away and auditable reason codes.

Maharani's

Projects

Featured Projects

Matting Board Supply Services for Work Over Well Services (WOWS)

Matting Board Supply Services for Work Over Well Services (WOWS)

Pertamina Hulu Rokan

Construction Unit Rate Basis

Pertamina Hulu Rokan

2025

Rental, Supply, and Installation of Matting Board (Package 2)

Rental, Supply, and Installation of Matting Board (Package 2)

Pertamina Hulu Rokan

Construction Unit Rate Basis

Pertamina Hulu Rokan

2025

Contract Service Working Unit Rate Multi Discipline

Contract Service Working Unit Rate Multi Discipline

Pertamina Hulu Rokan

Construction Unit Rate Basis

Pertamina Hulu Rokan

2025

Contract Service Working Unit Rate Earthwork for Wellpad Preparation Central Area

Contract Service Working Unit Rate Earthwork for Wellpad Preparation Central Area

Pertamina Hulu Rokan

Construction Unit Rate Basis

Pertamina Hulu Rokan

2024

Civil Works for Booster Pump Batang HO

Civil Works for Booster Pump Batang HO

PGAS Solution

Engineering & Construction

Pertamina Gas

2024

Contract Service Working Unit Rate Earthwork for Wellpad Preparation

Contract Service Working Unit Rate Earthwork for Wellpad Preparation

KSO PT Manora Prima Sejati - PT...

Construction Unit Rate Basis

Pertamina Hulu Rokan

2024

Site Preparation and Booster Pump Batang HO Installation Works

Site Preparation and Booster Pump Batang HO Installation Works

PGAS Solution

Engineering & Construction

Pertamina Gas

2024

HDD (Horizontal Directional Drilling) Construction Works for SKTM 20 KV

HDD (Horizontal Directional Drilling) Construction Works for SKTM 20 KV

PT PLN (Persero) Unit Induk Dist...

EPC

PT PLN (Persero) Unit Induk Distribusi Jakarta

2024

Civil Works and Wellpad Preparation in Rokan Working Area Phase 2

Civil Works and Wellpad Preparation in Rokan Working Area Phase 2

PT Perta Drilling Contractor

Construction Unit Rate Basis

Pertamina Hulu Rokan

2023

Civil Works and Wellpad Preparation in Rokan Working Area Phase 1

Civil Works and Wellpad Preparation in Rokan Working Area Phase 1

PT Perta Drilling Contractor

Construction Unit Rate Basis

Pertamina Hulu Rokan

2023

Documentations